Performance Tests

The performance tests that follow will ensure that the Tester, or Unit Under Test (UUT),
is in proper operating condition and will check the accuracy of each Tester function
against its specifications. To perform the tests you will need a Fluke 5320A/VLC
Calibrator or equipment meeting the minimum specification given in Table 2. Before you
begin the accuracy tests, allow the Tester to stabilize to room temperature. Depending on
temperature gradient, this could take up to several hours.
If the Tester fails any of these tests, it needs calibration adjustment or repair.

Backlight Test

To test that the backlight circuit works, do the steps that follow:
1. Turn the Tester on using
2. To turn on the backlight, press
3. Press the

LCD Test

To test all LCD segments and the display's contrast quality:
1. To turn the UUT off, press
2. While holding down
3. Continue to hold
4. Compare the display segments to Figure 2 for the 1652C and 1653B. Compare the
18
button a second time to turn it off.
down after releasing
display segments to Figure 3 for the 1654B. Check for any missing segments or poor
contrast areas.
Figure 2. 1652C and 1653B LCD Tests
.
once.
.
, power the Tester back on.
.
gad001.eps

Advertisement

Table of Contents
loading

This manual is also suitable for:

1653b1654b

Table of Contents