Motor And Bucket Service Assembly - Fitting - Dyson PH01 Service Instructions Manual

Table of Contents

Advertisement

Repair notes

Motor and Bucket Service Assembly - fitting

Cross section view of Upper retention
ring and spring positions
Important:
during shipping/transport the
Upper, Lower retention rings and springs
can detach. Before fitting the Motor and
bucket assembly the Upper and Lower
retention rings have to be seated on their
corresponding ledges on the motor bucket
and the six springs attached as shown. If
this is not carried out the Motor and bucket
assembly will not fit correctly into the main
body.
Top view of motor
Bottom view of motor
63 Important: ensure both the Upper and Lower retention rings and all six tension springs are
located correctly around the top and bottom of the motor bucket assembly.
Failure to do so will result in a failed repair.
Spring
Upper
retention ring
40
64 Line up the new Motor and Bucket service assembly as shown.
Position the grommet to the left of the Main PCB and the motor bucket retaining clip located in the
centre of the Main PCB and LCD UI display.
Slide the Motor and Bucket gently down into the Main body.
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ph02

Table of Contents