Flue terminal plume redirection

The flue discharge can be re-directed to allow some plume redirection
control. Alternatively, a complete plume management system can be
fitted to the flue terminal.
Re-directing the flue discharge
NOTICE:
Damage to flue or terminal outlet.
The flue terminal outlet has built-in stops to limit rotation for horizontal
fluing. This allows condensate to run back to the boiler for safe disposal
▶ Do not rotate the complete flue terminal assembly.
▶ Do not attempt to force beyond the limit stops.
▶ Using a suitable tool release the clip [2] either side, unclip the
terminal end [1].
▶ Rotate the end by 180° and refit the terminal end [1], ensuring to
engage the clips [2] to secure.
– If it is required to also angle the plume off the vertical line, the
deflector can be rotated 80° either side.
▶ Loosen the screws securing the entire outlet assembly and rotate by
± 80° to the desired position and re-secure the assembly.
1
2
Fig. 26 Plume redirection
NOTICE:
Outlet positions
▶ The flue terminal outlet position must follow those shown in
figure 27.
▶ When redirecting the flue discharge the terminal end must be at least
1,500mm from any opening in the direction of the discharge to
prevent combustion products from entering the building as shown
Greenstar Condensfit II – 6 720 874 391 (2019/04)
3
180°
±80°
1
1
4
Fig. 27 Plume redirect distance to opening
[1]
Opening to building
[2]
Minimum 1,500mm from an opening in the building
[3]
Flue gas discharge
[4]
Terminal end
Installation
2
3
0010013490-001