Required Tools And Materials - Siemens SIMATIC NET RUGGEDCOM RX1536 Installation Manual

Rugged multi service platforms
Hide thumbs Also See for SIMATIC NET RUGGEDCOM RX1536:
Table of Contents

Advertisement

Introduction
1.3 Required Tools and Materials
1
2
3
4
5
6
7
Figure 1.1
Management Port
RS-232 Serial Console Port
Utility USB Port
Lamp Test/Alarm Cut-Off (LT/
ACO) Button
Power Status LEDs
Port Status LEDs
Alarm Indicator LED
1.3

Required Tools and Materials

The following tools and materials are required to install the RUGGEDCOM RX1536:
AC/DC power cord (16 AWG)
2
1
2
Management Port
RS232 Serial Console Port (DB9)
Utility USB Port
Port Status LEDs
Power Status LEDs
Alarm Indicator LED
Lamp Test/Alarm Cut-Off (LT/ACO) Button
RUGGEDCOM RX1536
Tools/Materials
4
5
7
3
6
This 10/100Base-T Ethernet port is used for system management
that is out-of-band from the switch fabric.
The serial console port is for interfacing directly with the device
and accessing initial management functions. For information
about connecting to the device via the serial console port, refer to
"Connecting to the Device (Page
Use the USB port to upgrade the RUGGEDCOM RX1536 software
or install files, such as configuration files and feature key files. For
more information, refer to the RUGGEDCOM ROX Configuration
Manual for the RUGGEDCOM RX1536.
This button performs two functions:
Press and hold this button to test all indicator LEDs
Press and release this button to acknowledge an active alarm
Indicates the status of the power modules.
Indicates when ports are active.
Green = OK
Orange = Warning alert
Red = Configuration error
Indicates when an alarm condition exists.
Green = Alarms cleared/acknowledged
Red = Alarm
For connecting power to the device.
21)".
Purpose
RUGGEDCOM RX1536
Installation Manual, 04/2021, C79000-G8976-1488-02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic net ruggedcom rx1500Ruggedcom rx1536

Table of Contents