Completed Sbu Ont; Figure 7. Completed Sbu Ont - ADTRAN Total Access 372E Installation And Maintenance Manual

Active ethernet small business unit ont
Hide thumbs Also See for Total Access 372E:
Table of Contents

Advertisement

Total Access 372 Active Ethernet Small Business Unit ONT Installation and Maintenance Guide

Completed SBU ONT

Figure 7
completely configured and installed in the Enclosure.
18
displays the various wire routing and drops when the Electronics Module is
Note: Electronics Module Cover has
been removed for illustration purposes.
Electronics
Module
Splice Tray
Fiber Optics
Cable
(Yellow)
Strain Relief
OptiTap
Fiber In
Ground
TOTAL ACCESS 373E
1287723G1
TELEPHONE TROUBLESHOOTING:
1. Identify the bad line (POTS 1-8).
2. Plug any working phone into
the appropriate jack.
If the telephone works, the unit
is functioning normally.
If the telephone does not work,
contact your service provider.
3. Remove the telephone from the
POTS jack.

Figure 7. Completed SBU ONT

Note: The RJ-11 POTS
ports are used for test
purposes only.
Tip (Green)
Ring (Red)
DS1
Connection (Red)
Ethernet
Connection (White)
SFP Connector
Power
Note: Cable color is for
clarity purposes only.
61287723G1-5B

Advertisement

Table of Contents
loading

Table of Contents