Install The Modules; Installe Modules Into The Front Panel (Standard) - TCS AMI Series Product Information

Hide thumbs Also See for AMI Series:
Table of Contents

Advertisement

Overview
Installation of the modules into the front panel (standard)
The modules are suited for the installation into the front panels of the flush-mount kits
ZAU200x and K3xxxx with a thickness of 3 mm.
weldet bolt M4
front panel
front panel post
TCS TürControlSysteme AG, TCS Hotline Germany: hotline@tcsag.de
Fax: +49 (0) 41 94 / 9 88 129  www.tcsag.de
8
172 mm
post cover,
Installation of the modules
front panel ZAU
ground plate,
top view
below
 Put the module unit (1) with front
panel sealing (2) from behind on-
to the welded bolts at the front
panel.
 Fix the module unit with 4 fas-
tening screws (3) (enclosed in the
delivery).
Recommendation:
Wire the modules (see product in-
formation of the specific module),
before installing the front panel into
2
the post or the flush-mount kit.
1
3
01/2013
□ 226 mm
from
Subject to technical changes.
PI_AMI1xx00_uk

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ami zau200 seriesAmi k3 series

Table of Contents