Connecting Power To The Junction Box - Graco Uni-Drum Instructions Manual

Supply system
Table of Contents

Advertisement

Installation
Connecting Power to the
Junction Box
Perform the following procedure to connect the power to
the Junction Box Panel (H).
All electrical wiring must be done by a qualified
electrician and comply with all local codes and
regulations.
If power and grounding connections are not done prop-
erly, the equipment may be damaged and the warranty
will be voided.
Have a qualified electrician connect the Junction Box
Panel (H) to a grounded electrical source and
disconnect that has the following required service
ratings:
Hz
120 Vac Models
50/60
24 Vdc Models
-
To connect the Junction Box Panel (H) to the electrical
source, perform the following steps:
1. Shut off system power at the main circuit breaker.
2. Remove the cover from the Junction Box Panel (H).
3. Locate the PLC power terminals KS102 and KS100
on the terminal strip inside the Junction Box Panel
(H). See F
. 8. For more information, refer to
IG
Electrical Diagram on page 91.
4. Using the upper wire duct on the left-hand side of
the Junction Box Panel (H), string two 14 AWG
wires inside the box from the electrical power
source.
5. Connect a ground wire to the ground lug shown in
F
. 8 on page 23.
IG
6. Connect the two 14 AWG wires to power terminals
KS102 (L1, hot) and KS100 (L2, neutral) in the
Junction Box Panel (H).
22
NOTICE
Phase
Circuit Breaker
1
5 Amp
-
7. Seal the area where wires entered the Junction Box
Panel (H).
8. Replace the cover on the Junction Box Panel (H).
309028ZAT

Advertisement

Table of Contents
loading

This manual is also suitable for:

309028zat

Table of Contents