4.
Tighten the gland to form a good seal.
5.
Close the lid and secure the locking ring before programming and instrument
configuration.
Notes:
•
Foundation Fieldbus (H1) must be terminated at both extreme ends of the cable for it
to work properly.
•
Please refer to the
Revision 2.0
devices.
Basic Configuration with Foundation Fieldbus (H1)
Configuration via
Gateway
Configuration via
Linking Device
7ML19985KL01
Foundation Fieldbus System Engineering Guidelines (AG-181)
, available from www.fieldbus.org, for information on installing FF (H1)
controller
LR250 FF
controller
LR250 FF
SITRANS LR250 (FF) – OPERATING INSTRUCTIONS
FF (HSE)
Rosemount
3420 HSE/H1
Gateway
FF (H1)
LR250 FF
FF (HSE)
HSE/H1
Linking Device
FF (H1)
LR250 FF
Basic Configuration cont' d on next page.
configurator
software
PC/laptop
LR250 FF
configurator
software
PC/laptop
LR250 FF
Page 23