Section 7. Setting the Unit - Vertical Installation

7.1 Secure Coil
STEP 1 - Remove Coil Panel.
STEP 2 - Remove screw from documentation packet.
STEP 3 - While the air handler is in the upflow position,
use the supplied screw to secure the coil seal plate to
cross member as shown.
Important: The Coil Seal Plate and screw secure the
coil in the center of the air handler. Failure to follow
these steps can prevent the Coil Panel from being easily
replaced on the unit.
7.2 Considerations
Provide a minimum height of 14 inches for proper
unrestricted airflow below the unit. Allow a minimum
of 21 inches clearance in front of the air handler to
permit maintenance and removal of filter.
• Position unit on suitable foundation. If a manu-
facturer approved accessory is not used, a frame
strong enough to support the total weight of the
unit, accessories, and duct work must be provided.
• Isolate unit from the foundation using a suitable
isolating material.
7.3 Upflow Installation
TASB Installation
1. Install the TASB plenum stand with integrated
sound baffle using the TASB instructions.
Note: Kit is used for open air applications.
TASB175SB for use with 17.5" cabinets
TASB215SB for use with 21.5" cabinets
TASB235SB for use with 23.5: cabinets
MITISRKIT1620 - Side return kit with 16"x20" filter
Contact your distributor for more information.
Typical Closet Installation
Airflow
Typical TASB Installation
Airflow