Hardware Installation And Connection; Installation Scenarios; Desktop Installation Procedure - ZyXEL Communications GS-3012F/3012 User Manual

Layer 2+ gigabit switch
Table of Contents

Advertisement

C
H A P T E R
Hardware Installation and
This chapter shows you how to install and connect the Switch.

2.1 Installation Scenarios

The Switch can be placed on a desktop or rack-mounted on a standard EIA rack. Use the
rubber feet in a desktop installation and the brackets in a rack-mounted installation.
For proper ventilation, allow at least 4 inches (10 cm) of clearance at the front
and 3.4 inches (8 cm) at the back of the Switch. This is especially important for
enclosed rack installations.

2.2 Desktop Installation Procedure

1 Make sure the Switch is clean and dry.
2 Set the Switch on a smooth, level surface strong enough to support the weight of the
Switch and the connected cables. Make sure there is a power outlet nearby.
3 Make sure there is enough clearance around the Switch to allow air circulation and the
attachment of cables and the power cord.
4 Remove the adhesive backing from the rubber feet.
5 Attach the rubber feet to each corner on the bottom of the Switch. These rubber feet help
protect the Switch from shock or vibration and ensure space between devices when
stacking.
GS-3012/GS-3012F User's Guide
2
Connection
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs-3012Gs-3012f

Table of Contents