Preparing The Signal Module For Operation - Siemens SIMATIC ET 200M Manual

Distributed i/o device
Hide thumbs Also See for SIMATIC ET 200M:
Table of Contents

Advertisement

Wiring

Preparing the Signal Module for Operation

Table 5-5
Preparing the signal module for operation
Step
20-Pin Front Connector
1.
Press down the unlocking button on the
top of the module and, at the same time,
push the front connector into its
operating position on the module. When
the front connector reaches its operating
position, the unlocking button will snap
back into the locking position.
Note: When the front connector is put in its operating position, a front connector
encoding device engages. The front connector then only fits this type of module.
2.
Close the front door.
3.
Enter the addresses for identifying the individual channels on the labeling strip.
4.
Slide the labeling strip into the guides on the front door.
5-20
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Tighten screws to bring front connector
to its operating position.
1
2
1a
40-Pin Front Connector
Distributed I/O Device ET 200M
EWA-4NEB780600602-06

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents