IBM Flex System EN4023 User Manual page 22

10gb scalable switch
Table of Contents

Advertisement

2
Installing the switch
6. Make sure the release levers on the switch are in the open position (perpendicular to the
7.
8. Push the release levers on the front of the switch to the closed position. After you insert and
12
switch). See
Figure 2
to view the release levers and locks on the switch.
For specific instructions for installing a switch in the chassis, see the documentation that
comes with the chassis.
1
2
2
1
1
Release lever
FIGURE 2
Switch release levers and locks
Slide the switch into the bay until it stops.
lock the switch, it turns on, and a power-on self-test (POST) occurs to verify that the switch is
operating correctly. The POST takes approximately 5 minutes to complete.
During POST, the switch LEDs will go through a lamp test. When the switch has completed
POST, all LEDs except the OK LED will power off and follow normal operation. Refer to
the information panel, LEDs, and external ports"
2
Release lever lock
on page 19 for more information.
IBM Flex System EN4023 10Gb Scalable Switch User's Guide
"Locating

Advertisement

Table of Contents
loading

Table of Contents