Copies all data from a specified range of measures to the selected
place in the same track. The copied data can also be transposed as
required. This operation overwrites the data from the beginning of the
specified destination measure with the data from the source measures.
Previous data in the overwritten measures is therefore lost.
The upper "TR" parameter selects the source track — i.e. the track
from which the data is to be copied: D1, D2, PC, BA, C1, C2, C3, C4.
The "M" parameters above the upper graphic bar are used to specify
the first measure:beat and last measure:beat of the range to be copied.
198
The Pattern Jobs
09 : Copy Event
First measure
Last measure
First beat
Last beat