10.7 Installation with clamp connections
Fig. 5: Clamp connection
NOTICE
Gasket and clamp
▶ The gasket and clamps for clamp connections are not in-
cluded in the scope of delivery.
1. Keep ready gasket and clamp.
2. Carry out preparation for installation (see chapter "Prepar-
ing for installation").
3. Insert the corresponding gasket between the body of the
product and the pipe connection.
4. Connect the gasket between the body of the product and
the pipe connection using clamps.
5. Re-attach or reactivate all safety and protective devices.
www.gemu-group.com
33 / 70
10 Installation in piping
GEMÜ 543
OPEN / CLOSE (Code AE)