Suzuki LT-Z250K4 Setup Manual page 10

Table of Contents

Advertisement

Available languages

Available languages

Align the dot mark on the handlebars with the master
cylinder-to-holder fitting surface. Tighten the master
cylinder mounting bolts to the specified torque.
"
"
"
" Front brake master cylinder mounting bolt:
NOTE:
To install the holder correctly, first tighten the
B B B B of the upper side with specified torque
bolt
and then tighten the bolt
A: Holder
B: Bolt
NOTE:
Install the holder in position according to the
mark "UP".
Make sure that the holder has no clearance at
the upper side as shown.
!
Check for brake fluid leakage.
A: Bolt
B: Holder
C: Master cylinder
D: Handlebars
Connect the front brake light switch lead wires cou-
pler to the brake light switch.
A: Front brake light switch
B: Lead wire coupler
Install the front brake hose to the brake hose guide
with the protector properly in place.
A: Front brake hose
B: Brake hose guide
C: Protector
D: Recess
9
10 N·m (1.0 kgf-m)
C C C C of the lower side.
C: Bolt
D: Dot mark

Advertisement

Table of Contents
loading

Table of Contents