Installation; Ceiling Mounted 1 - Taiden TES-5604 Series Installation And Operating Manual

Classroom
Table of Contents

Advertisement

2.3 Installation

2.3.1 Ceiling mounted 1

Mounting steps:
Step 1: Install the ceiling mounting kit at the top of the TES-568xM;
Step 2: Drill a hole with 98 mm diameter into the ceiling (for mounting and heat elimination during operation);
WARNING:
 Do not cover the venting to keep good ventilation for the equipment.
Step 3: Hold the spring straightly and vertically, insert it into the mounting hole until the base of the TES-568xM can fit
with the ceiling.
Figure 2.6 Ceiling mounted 1
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents