CHECKOUTPROCEDURES
After installation
has been completed,
it is recommended
that the Air Handler
be checked against
the following
checklist.
!. Make sure power is "OFF" at power
disconnect switch ...................................................
[
2. Check all field wiring for tight connections.
See
that grounding
of unit is in accord with code ........ [
3. Make sure unit suspension
(if used) is secure
and that there are no tools or loose debris in,
around or on top of the unit ...................................
[
4. Check all duct outlets; they must be open
and unrestricted
.....................................................
[
5. Check drain lines and be sure
all joints are tight ..................................................
[
]
]
6.
7.
8.
]
9.
]
!0.
]
Make sure secondary drain pan is installed
.......... [ ]
Check power supply for correct requirements
per unit nameplate
................................................
[ ]
Check filters for proper size. Inform owner
of proper procedure for removal and
reinstallation
.........................................................
[ ]
Energize the system and carefully observe its
operation;
make any necessary
adjustment
.......... [ ]
Instruct
owner, engineer (if possible) on proper
operating
procedure and leave Use and Care
Manual with owner ................................................
[ ]
SUPPLEMENTARY
HEATERS
CHECKOUT
PROCEDURES,
iF USED DOES HEATER REQUIRE A SPECIAL CiRCUiT?
SEE "LiMiTATiONS AND RECOMMENDATIONS"
!. Be sure the disconnect switch is "OFF", and safety label (if any) is attached
...............................................
[ ]
2. Check on field wiring for tight connections and grounding according to codes .............................................
[ ]
3. Check circuit protection
for proper size per nameplate
specifications
...........................................................
[ ]
4. Check control box panel -- in place and secured ...........................................................................................
[ ]
NOTE:
OPERATION OF HEATERS MUST BE CHECKED DURING THE OPERATION CHECK OF THE TOTAL SYSTEM.
American
Standard Inc.
6200 Troup Highway
Tyler, TX 75711
8/04
For more information contact
Since the manufacturer
has a policy of continuous product and product data improvement,
it reserves the right
your loca! dealer(distributor)
to change design and specifications
without notice.