Inspecting For Damage - Cisco CDE 220 Series Hardware Installation Manual

Content delivery engine
Table of Contents

Advertisement

Inspecting for Damage

Caution
Carefully open the box.
Step 2
Remove all packing material.
Step 3
Remove the chassis from the box.
Step 4
Carefully open the additional boxes and remove the packing material and contents.
Step 5
Open the accessory kits and boxes that contain the cables and so forth.
Step 6
Caution
Tip
Verify that your shipment is complete by making sure you received everything on your packing list, and
then comparing the packing list to your order. If any items are missing or if you need additional
information, contact Cisco Technical Support at the following
URL:http://www.cisco.com/cisco/web/support/index.html.
Inspecting for Damage
After you verify that all of the equipment is included, carefully examine the CDEs, cards, power
supplies, and cables for any damage resulting from shipping. If you suspect any damage from shipping,
contact your local freight carrier for procedures on damage claims.
If you observe any physical defects in the items you ordered, contact your sales representative or Cisco
Technical Support.
Installing the CDEs
Installing the CDEs consists of the following tasks:
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
3-2
If any damage or other signs of mishandling are evident, inform both the local freight carrier
and Cisco before unpacking. Your freight carrier can provide you with the procedures
necessary to file a claim for damages.
Do not use a knife to open these boxes.
Save the boxes and packing material should you need to return any components to Cisco.
Reviewing Rack Installation Safety Guidelines, page 3-3
Preparing the CDEs for Rack Installation, page 3-3
Rail Kits, page 3-14
Making Physical Connections, page 3-37
Chapter 3
Installing the Content Delivery Engines

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents