Unpacking And Inspecting The Server; Preparing For Server Installation - Cisco CDE 220 Series Hardware Installation Manual

Content delivery engine
Table of Contents

Advertisement

Chapter 3
Installing the Content Delivery Engines

Unpacking and Inspecting the Server

When handling internal server components, wear an ESD strap and handle modules by the carrier edges
Caution
only.
Keep the shipping container in case the server requires shipping in the future.
Tip
The chassis is thoroughly inspected before shipment. If any damage occurred during transportation or
Note
any items are missing, contact your customer service representative immediately.
Remove the server from its cardboard container and save all packaging material.
Step 1
Compare the shipment to the equipment list provided by your customer service representative. Verify
Step 2
that you have all items.
Check for damage and report any discrepancies or damage to your customer service representative. Have
Step 3
the following information ready:

Preparing for Server Installation

This section provides information about preparing for server installation, and it includes the following
topics:
Installation Guidelines
Warning
To prevent the system from overheating, do not operate it in an area that exceeds the maximum
recommended ambient temperature of: 35° C (95° F).
Statement 1047
Invoice number of shipper (see the packing slip)
Model and serial number of the damaged unit
Description of damage
Effect of damage on the installation
Installation Guidelines, page 3-31
Rack Requirements, page 3-32
Equipment Requirements, page 3-33
Slide Rail Adjustment Range, page 3-33
Cisco Content Delivery Engine 205/220/250/280/285/420/460/475 Hardware Installation Guide
Unpacking and Inspecting the Server
3-31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents