Download Print this page

Konica Minolta ViZion DR + Install Manual page 2

Dr panel

Advertisement

4. Remove the panel from the antistatic bag.
5. Remove the battery charger from the box. Under the battery charger are two (2) external power
supplies. One (1) is to be used for the battery charger, and the other can be stored.
6. Remove the two (2) batteries from the box and place both in the charger. Batteries should be
charged prior to use.
VZ0001HTG201507-2.6
Customer Support
ViZion DR + Install Guide v2.6
1.800.366.5343 –
HCITsupport@konicaminolta.com
2
Opal UAI 2.3.x.x

Advertisement

loading