Ensure that all vent connections are installed by placing three (3) screws evenly spaced and a small bead
of high temperature silicone at each chimney connection. Also ensure that all vertical vent sections are
properly supported and that all clearances to combustibles are maintained in accordance with the vent
manufacturer's specifications.
Vent termination cap
(stainless steel termination
hood) or 45° elbow with
rodent screen
Wall strap
(recommended with
use of vent pipe)
Vent pipe or 2 foot
(610 mm) riser
Pipe adapter (if
using 2 foot riser)
Exterior blower
and housing
Horizontal frame
for thimble
Armour cable supplying
power to exterior blower
TO SUPPLY POWER TO THE EXHAUST BLOWER:
Install an amour coated electrical cable from the exhaust blower housing, through the wall thimble, and
attach to the pre-drilled hole in the left hand rear hopper pillar. Hook up to wires from the wiring harness
for the exhaust blower. All electrical connections must be in accordance with local code requirements (see
W
d
).
iring
iagram
Installation
Siding
ENVIRO Meridian | Cast Iron
Figure 32: Exhaust Blower Installation; Horizontal Termination.
90° elbow
Wall framing
Wall thimble
27

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Meridian-1Meridian fpiMeridian cast ironGf55Gfi55

Table of Contents