Husqvarna PT26D Workshop Manual page 84

Hide thumbs Also See for PT26D:
Table of Contents

Advertisement

21. Assemble the front drive disc. Align in
the keyway and tighten the centre bolt as
set out in the table.
22. Connect the power cable and tie it up
using a cable tie so it cannot rub against
the flywheel or other rotating parts.
23. Assemble the power take-off belts.
24. Assemble the belt tensioner springs.
25. Assemble the drive axle for the hydraulic
pump and spacer ring on the front clutch.
Caution: The bolts for the rear clutch are
covered with dry locking and may only
be fitted three times. Tightening torque
according to the table.
26. Assemble the plate over the hydraulic
pump's drive axle, the fuel tank and
driver's seat.
27. Fill with fuel and bleed the fuel system.
28. Check the function of the solenoid
clutch.
Measuring the solenoid clutch resistance
See "Solenoid clutch" on page 127.
Guideline values 2 .
REPAIR INSTRUCTIONS
Measuring the solenoid clutch resistance
8043-195
83
English-

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents