Download Print this page

Quick Setup - Trane VarioTrane TR1 2800 Series Operating Instructions Manual

Advertisement

Quick Setup

Using this Quick Setup, you can carry out quick and EMC-correct installation of the frequency converter in five
steps. The Operating Instructions, which are also enclosed, give other examples of installation and describe all
functions in detail.
NOTE:
Read the safety instructions before i nstalling the unit.
TR1 2800 Series VFD allow side-by-side installation. Because of the need for cooling, there must be 10 cm free
air passage above and below the frequency converter. Drill holes in accordance with the measurements given
in section Mechanical dimensions  . Retighten all four screws.
Fit the decoupling plate to the power cables and the earth screw (terminal 95).
Please note that the power terminals can be removed. Connect mains to the mains terminals of the frequency
converter, i.e. 91, 92, 93 and the earth connection to terminal 95. Fit a screened/armoured cable from the motor
to the motor terminals of the frequency converter, i.e. U, V, W. The screen ends in a screen connector.
TR1 2800 Series VFD
9

Advertisement

loading