Attaching The Quake Proof Stabilizer Kit - Fujitsu PRIMERGY 19 User Manual

19-inch rack
Table of Contents

Advertisement

4.4 Attaching the Quake Proof Stabilizer Kit

■ Confirm the components, and prepare the necessary tools.
Confirm that all components have been delivered (see the table below).
※In case of install a stabilizer kit must be done by customers.
・Front, Side Quake Proof Stabilizer kit for PRIMERGY 19inch Rack(wide / base / rear CDU installed)
Type name: PY-RT81
・Front, Rear and Side Quake Proof Stabilizer kit for PRIMERGY 19inch Rack(wide / base)
Type name: PY-RT82
・Front, Rear Quake Proof Stabilizer kit for PRIMERGY 19inch Rack (wide / base)
Type name: PY-RT83
・Side Quake Proof Stabilizer kit for PRIMERGY 19inch Rack(wide / base / front and rear CDU installed)
Type name: PY-RT84
Quake Proof Stabilizer kit (wide/expansion only front) is same as Stabilizer (PY-RS82).
Also, prepare the necessary tools:
・Spanner: For M10 bolts
Product name
Front part
Side part
M10 bolt
Product name
Front part
Rear part
Side part
M10 bolt
Product name
Front part
Rear part
M10 bolt
Product name
Side part
M10 bolt
45
Quantity
1
2
12
Quantity
1
1
2
16
Quantity
1
1
8
Quantity
2
8

Advertisement

Table of Contents
loading

Table of Contents