Download Print this page

Vulcan-Hart GH30 Installation & Operation Manual page 8

Gh series heavy duty gas ranges

Advertisement

3. Carefully lift riser, backguard or high shelf over range (Fig. 6).
4. Carefully guide support channels into the two openings provided at the rear of the range (Fig. 7).
While lowering support channels into openings, be sure that the lower angle flange of the riser,
backguard or high shelf is positioned outside the flue back (Fig. 8).
Once the backguard is setting in place on the range, install the left and right end caps. End caps simply
slide on, in between the splasher and the backguard. There is a tab on the cap that can be pulled out
or pushed in (with a screwdriver) to adjust cap for tightness. Two caps are packaged with each
backguard in a separate plastic bag. Be sure to look for caps in the backguard box. See Figs. 9, 10,
11 and 12.
Fig. 6
Fig. 9
Fig. 8
– 8 –
Fig. 7
Fig. 10

Advertisement

loading