Routing The Bagger Belt Into The Blower Assembly; Installing The Blower Assembly - Toro 78534 Operator's Manual

60in or 72in e-z vac bagger z500 series z master mowers
Hide thumbs Also See for 78534:
Table of Contents

Advertisement

Figure 9
1. Hood assembly
2. Bag
3. Bag tab
4. Lower the bagger hood over the bags
Figure 10
1. Hood
2. Bag
5. Position the bagger latch under the latch hook
11).
6. Push down on the bagger latch until it locks into place
(Figure
11).
4. Notch
5. Bagger frame
(Figure
10).
3. Bagger latch
4. Latch hook
(Figure
1. Bagger latch
5
Routing the Bagger Belt into
the Blower Assembly
Parts needed for this procedure:
1
Bagger belt (from the Blower and Drive Kit)
Procedure
1. Install the belt around the blower pulley
2. Install the spring to the idler arm and the peg on the
blower assembly
1. Idler pulley
2. Mower-deck pulley
3. Spring
9
Figure 11
2. Latch hook
(Figure
(Figure
12).
Figure 12
4. Peg
5. Belt
6. Blower pulley
12).

Advertisement

Table of Contents
loading

This manual is also suitable for:

78535

Table of Contents