General Work; Internal Leak Test; Determining The Test Volume - Buderus Logano plus GB402 Installation And Maintenance Instructions For Contractors

Table of Contents

Advertisement

Fig. 39 Removing the front panel
[1]
Front panel
Pipe length
[m]
1
2
3
4
5
6
7
8
9
10
Table 15 Pipework volume (V
pipe
Pipe length
[m]
1
2
3
4
5
6
7
8
9
10
Table 16 Pipework volume (V
pipe
Logano plus GB402 – 6 720 820 700 (2018/01)
½
¾
0.2
0.4
0.4
0.7
0.6
1.1
0.8
1.5
1.0
1.8
1.2
2.2
1.4
2.5
1.6
2.9
1.8
3.3
2.0
3.6
) subject to pipe length and diameter
15 x 1
18 x 1
0.1
0.2
0.3
0.4
0.4
0.6
0.5
0.8
0.7
1.0
0.8
1.2
0.9
1.4
1.1
1.6
1.2
1.8
1.3
2.0
) subject to pipe length and diameter
10.2

General work

The following work is not described in any further detail in this
document. It must, nevertheless, still be carried out:
▶ Check the general condition of the heating system.
▶ Visual inspection and function check of the heating system.
▶ Check the ventilation air and flue gas routing for function and safety.
▶ Check all gas and water pipes for signs of corrosion.
▶ Replace any corroded lines.
▶ Check the pre-charge pressure of the diaphragm expansion vessel.
▶ Check the concentration of any antifreeze/additives that may be
used in the system fill/top-up water annually.
▶ If necessary, check installed water treatment cartridges (in the
backfeed section) to ensure they are functioning correctly and for
wear.
10.3

Internal leak test

10.3.1 Determining the test volume

V
= V
= V
+ V
test
total
pipe
▶ Determine the length of pipe to the main fuel shut-off valve.
▶ Determine the gas train volume (V
▶ Determine the pipe volume (V
▶ Calculate the test volume (V
Gas valve volume (approximate values)
Gas valve volumes up to 50 kW
Gas valve volume > 50 kW
Table 14 Gas train volume (V
Pipework volume (V
) [l]
pipe
Pipework diameter [inch]
1
0.6
1.0
1.2
2.0
1.7
3.0
2.3
4.0
2.9
5.1
3.5
6.1
4.1
7.1
4.6
8.1
5.2
9.1
5.8
10.1
Pipework volume (V
) [l]
pipe
Pipework diameter (copper pipe) [mm]
22 x 1
28 x 1.5
0.3
0.5
0.6
1.0
0.9
1.5
1.3
2.0
1.6
2.5
1.9
2.9
2.2
3.4
2.5
3.9
2.8
4.4
3.1
4.9
Inspection and servicing
gas train
) using table 14.
gas train
) using table 15 and table 16).
pipe
) according to the above equation.
test
)
gas train
1.4
2.7
4.1
5.5
6.9
8.2
9.6
11.0
12.4
13.7
35 x 1.5
0.8
1.6
2.4
3.2
4.0
4.8
5.6
6.4
7.2
8.0
10
0.1
0.2
2
2.2
4.4
6.6
8.8
11.0
13.2
15.4
17.6
19.8
22.0
45 x 1.5
1.4
2.8
4.2
5.5
6.9
8.3
9.7
-
-
-
33

Advertisement

Table of Contents
loading

Table of Contents