Install The Front Plate; Thermostat Connection - Vermont Castings 3926 Homeowner's Installation And Operating Manual

Pinnacle & stardance direct vent, rear vent gas heater
Table of Contents

Advertisement

Pinnacle & Stardance Direct Vent - Rear Vent Gas Heaters
Switch
Assembly
Screws
Fig. 40 Attach switch assembly to rear shroud.
Fig. 41 Attach switch wires to valve.

Install the Front Plate

Grasp the Front Plate and lift it into position, engaging
the two steel tabs at the upper corners behind the
adjacent bosses in the Side Plates. (Fig. 42) Seat the
Front against the Sides so that the tabs at the bottom
lip engage with the notches in the edge of the stove
base.
When properly installed, the bottom of the Front Plate
cannot be pulled away from the sides without also
lifting it up.
If you are installing optional Warming Shelves, do so now,
according to the instructions supplied with that kit.
Bottom Tabs
Engage Notch in Base
Fig. 42 Install Stove Front.
24
Existing
Holes
Use only a thermostat rated for 500 - 750 millivolts.
Check the table below for the appropriate gauge
thermostat wire to use for the length of lead required in
your installation.
ST315
1. Install the wall thermostat in the desired location
and run the wires to the stove location. Terminate
these leads with 1/4" female connectors.
2. Connect the thermostat wires to the valve. (Fig. 41)
This completes assembly of the PDV20 and SDVR
stove.
ST228
ST407

Thermostat Connection

(Optional) R Models Only
Thermostat
Wire / Gauge
Maximum Run
18
20
22
40 feet
25 feet
16 feet
20007066

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents