Figure 33 - Solution Analysis / Control Panel Parts Replacement Screen - York EX Series Installation, Operation & Maintenance Instructions Manual

Double effect direct fired absorption chiller-heater
Table of Contents

Advertisement

FORM 155.32-ICOM1.EN.GB
ISSUE DATE: 10/13/2017
SOLUTION ANALYSIS / CONTROL PANEL

FIGURE 33 - SOLUTION ANALYSIS / CONTROL PANEL PARTS REPLACEMENT SCREEN

The Solution Analysis section of the screen shows the
maintenance interval and current operation hours since
the last inhibitor solution maintenance.
Keep the inhibitor concentration within the proper
range to prevent corrosion. Periodic analysis of the so-
lution and addition of inhibitor is required.
When maintenance is overdue, the maintenance alarm
is activated with the warning "Solution analysis should
be done." When the warning appears, contact your lo-
cal Johnson Controls Service Center.
JOHNSON CONTROLS
PARTS REPLACEMENT SCREEN
The Control Panel Parts Replacement section of the
screen shows the maintenance interval and current op-
eration hours since the last control panel maintenance.
Periodic maintenance prevents malfunctions of the
control panel. It also helps keep safety devices from
deteriorating.
When maintenance is overdue, the maintenance alarm
is activated with the warning "Control panel parts
should be replaced." When the warning appears, con-
tact your local Johnson Controls Service Center.
SECTION 6 – OPERATION
LD21347
97
6

Advertisement

Table of Contents
loading

Table of Contents