Figure 35 - Burner Parts Replacement/ Burner Combustion Check Screen - York EX Series Installation, Operation & Maintenance Instructions Manual

Double effect direct fired absorption chiller-heater
Table of Contents

Advertisement

FORM 155.32-ICOM1.EN.GB
ISSUE DATE: 10/13/2017
BURNER PARTS REPLACEMENT/ BURNER COMBUSTION CHECK

FIGURE 35 - BURNER PARTS REPLACEMENT/ BURNER COMBUSTION CHECK SCREEN

The Burner Parts Replacement section of the
screen displays the maintenance interval and cur-
rent operation hours since the last maintenance
of the control panel. It is important to prevent
malfunction of the burner and its related devices
from deterioration. When the required main-
tenance interval has passed, the maintenance
alarm is activated with the warning "Burner parts
should be replaced." When the warning appears,
contact your local Johnson Controls service cen-
ter.
JOHNSON CONTROLS
SCREEN
The Burner Combustion Check section of the screen in-
dicates the maintenance interval and current operation
hours since the last maintenance of the burner combus-
tion. It is important to keep the combustion properly
adjusted to prevent abnormal combustion. Periodic
check and adjustment of the combustion is required.
When the required maintenance interval has passed,
the maintenance alarm is activated with the warning
"Burner combustion should be checked." When the
warning appears, contact your local Johnson Controls
service center.
SECTION 6 – OPERATION
LD21979
LD21554
99
6

Advertisement

Table of Contents
loading

Table of Contents