Omron F300 Installation Manual page 65

Visual inspection system
Table of Contents

Advertisement

System Setup
OVL Unit
1, 2, 3...
Strobe I/F Unit
F300-FS Strobe I/F Unit
F309-VFS Strobe Cable, 2 m.
(Purchased separately)
58
Follow the procedure below to connect and disconnect the F300-K Keyboard
and the OVL Unit.
F300-L12E
OVL Unit
1. Holding the connector with the lock lever pointing up, push the connector
straight in until it locks.
2. Push down the lock lever to unlock the connector and pull the connector
straight out.
Lock lever
Section
F300-K
Keyboard
Strobe
3-5

Advertisement

Table of Contents
loading

Table of Contents