Verifying Operation

After properly wiring and installing the 24 V Power Supply Option, use the following
procedure to check for normal operation.
Procedure
1. Make sure the drive main circuit power is on and 24 V external power is supplied to the 24
V connector plug. Switch off the main power supply to the drive. The 24 V external power
supply should provide power to the drives control circuit.
2. A green LED on the 24 V Power Supply Option indicates proper operation.
3. The LED operator (or the LCD operator) on the drive should display "Uv" for about 10
seconds to indicate an undervoltage situation.
Note: If "Uv" does not flash on the display screen, check the wiring. If "Uv" fails to appear on the
display screen after confirming proper wiring, the drive may be damaged.
Power Supply and the Control Circuit
Table 8
outlines the various conditions under which the 24 V Power Supply Option provides
power to the control circuit.
Drive Main Circuit
Input Power Supply
ON
ON
OFF
OFF
YASKAWA ELECTRIC TOBP C730600 27B V1000 Option PS-V10 Installation Manual
Table 8 Power Supply and Control Circuit
Power from 24 V Power
Supply Option
ON
OFF
ON
OFF
6 Verifying Operation
Control Circuit
Operation in Drive
Normal operation
Stop
Drive Operation
Possible
Possible
Not possible
Not possible
29