Equipment Manual; Installation Procedure; Cabling And Equipment; Grounding - Siemens SWT-3000 Equipment Manual

Hide thumbs Also See for SWT-3000:
Table of Contents

Advertisement

SWT 3000 Equipment Manual

Equipment manual

Installation procedure

The main steps in the installation procedure are listed below:

Cabling and equipment

Grounding

© SIEMENS AG 2008
The equipment manual is written for service and operation personnel
in the high voltage power line environment. All existing safety instructions
in the client's environment have to be observed and only trained and
instructed personnel is authorized to work with the equipment.
Transport device or cabinet to the installation room in its packaging
Unpack and dispose of transport packaging
Check delivery for completeness and for mechanical damage
Secure cabinet to the floor or wall, or install device in cabinet or rack
Connect grounding wire
Connect power supply
Cable data connections to the main distribution frame or the peripheral
devices
Cable the alarm outputs
SWT 3000 devices can be supplied as standalone devices or installed in
a cabinet together with other system components. In case of delivery in
a cabinet the entire cabling of the individually installed devices is in-
stalled at the factory up to the connection terminals on the assembly
board. In this case the connection points for the cabling can be found
in the supplied cabinet documentation.
Caution!
The cross section of the grounding wire and the laying of the wire must
comply with the regulations applicable for the place of installation.
Edition p3_3_2x 08/09
Installation and Commissioning
Page - 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents