Creating A Simatic S7 Project (Profibus); Simatic S7 Project Overview - Siemens SINUMERIK 840D sl Commissioning Manual

Cnc commissioning: nc, plc, drive
Hide thumbs Also See for SINUMERIK 840D sl:
Table of Contents

Advertisement

PLC commissioning

5.2 Creating a SIMATIC S7 project (PROFIBUS)

5.2
Creating a SIMATIC S7 project (PROFIBUS)
5.2.1

SIMATIC S7 project overview

Steps to be taken
A SIMATIC S7 project must be created for the basic commissioning of the PLC, the Ethernet
and PROFIBUS communication as well as the input/output data areas of the NC. To do this,
perform the following steps:
● Create a project
● Insert a SIMATIC station 300
● Insert an NCU to the hardware configuration
● Configuring interfaces
● Insert the machine control panel and handwheel
What do you need to be aware of?
Loading the PLC via interface X130 is also possible if the IP address of the Ethernet interface
is known. Loading an archive may always be performed if the communication HMI↔NC is
available.
Note
Loading the PLC (CP840) is essential for the configuration of the data path for saving/restoring
the drive data.
Additional information about the interface signals is provided in SINUMERIK 840D sl "PLC
(https://support.industry.siemens.com/cs/ww/en/view/109767449)" Function Manual.
Operating sequence
You have started the SIMATIC Manager.
1. To create a new project, select the "File" → "New" menu command in the SIMATIC Manager.
2. Enter the project data:
– Name (for example: SINU_840Dsl)
– Storage location (path)
– Type
3. Confirm the dialog with "OK".
The project window is displayed showing an empty S7 project structure.
52
CNC Commissioning: NC, PLC, Drive
Commissioning Manual, 12/2019, A5E48312804B AA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinumerik 840de sl

Table of Contents