Requirements for commissioning
3.4 Power-On and boot-up
3.4
Power-On and boot-up
3.4.1
NC and PLC memory reset
SVC/NCK and PLC rotary switches
The NCU has two rotary switches in the lower section of the front panel.
Meaning of the settings at the rotary switch SVC/NCK:
Switch position
The settings on the PLC switch have the same meaning as for a SIMATIC S7-CPU:
Switch position
34
NC operating mode
0
Normal power-up of the NC
1
Power-up of the NC with preset values (= general reset)
2
Power-up of the NC with preset values; after powering up, the PLC is in RUN.
7
Debug mode (NC is not started)
8
IP address of the NCU is displayed on the seven-segment display
All others
Not relevant
Operating mode of the PLC
0
RUN
1
RUN (protected mode)
2
STOP
3
Memory reset (MRES)
All others
Not relevant
CNC Commissioning: NC, PLC, Drive