Figure 17. Releasing the latches in the middle of the rails and pushing the system into the rack
3. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
4. To insert the memory riser, complete the following steps:
a) Ensure that the release latches (A) are fully open to a 90-degree angle as shown in Figure 18 on
page 19.
b) Align the memory riser with the connector.
c) Press the memory riser firmly into the connector.
d) Rotate the release latches into the closed position, and press the release latches down to ensure
that the memory riser is fully seated into the connector.
18 Power Systems: Installing the IBM Power System E950 (9040-MR9)