Chassis installation time requirements
The following table lists procedures you must use to install the Ethernet
Routing Switch 8600 chassis and the estimated time you need to complete
each procedure. Not all procedures are required for every Ethernet
Routing Switch 8600 system.
Table 4
Installation procedures and time requirements
Procedure
Positioning the chassis on a flat surface
Mounting the chassis in an equipment rack
Installing the cable management brackets
Positioning the chassis on a flat surface
As long as you provide adequate space around the unit for access to cable
connectors, you can mount the chassis onto an appropriate flat, level
surface that can safely support the weight of the chassis, the components,
and the attached cables.
Procedure steps
Step
1
2
Mounting the chassis in an equipment rack
Mount the chassis in a standard 19 in. equipment rack. If you mount
the chassis in a 23 in. equipment rack, see the rack adapter installation
instructions provided by the rack manufacturer.
Copyright © 2008 Nortel Networks
.
"Mounting the chassis in an equipment rack" (page 45)
"Installing the cable management brackets" (page 52)
Action
Place the switch on the flat surface and check for proper
ventilation.
Allow at least 2 in. (5.1 cm) on each side for proper ventilation
and 5 in. (12.7 cm) at the front for power cord clearance.
Attach rubber feet to each marked location on the bottom of the
chassis.
The rubber feet are optional but Nortel recommends that you use
them to help keep the unit from moving.
Nortel Ethernet Routing Switch 8600
Installation — Chassis
NN46205-303 02.01 Standard
30 May 2008
Mounting the chassis in an equipment rack 45
Time requirement
5 minutes
12–30 minutes depending on the chassis
5 minutes
--End--