Heater Control - Daikin VRV II RXYQ5MATL Service Manual

R-410a heat pump 60hz
Table of Contents

Advertisement

Outline of Control (Indoor Unit)
6.7

Heater Control

The heater control is conducted in the following manner.
[Normal control]
While in heating operation, the heater
control (ON/OFF) is conducted as
shown on the right.
[Overload control]
When the system is overloaded in
heating operation, the heater will
be turned OFF in the following two
manners.
(1) The heater control (ON/OFF) is
(2) The heater control (ON/OFF)
[Fan residual operation]
While the heater turns OFF, in order to prevent the activation of the thermal protector, the fan
conducts residual operation for a given period of time after the heater turns OFF. (This
operation is conducted regardless of with or without heater equipped.)
Residual operation time = 100 seconds on ceiling suspended type or 60 seconds on other types
102
conducted through the liquid
pipe temperature (R2T) of the
indoor unit.
is conducted by converting
the heater temperature into
the condensing pressure
equivalent saturated
temperature (Tc) according
to the temperature detection
through the high pressure sensor (SINPH) of the outdoor unit.
ON
ON
43ºC
ON
50ºC
Si39-504
Set temperature
2ºC
2ºC
50ºC Liquid pipe temperatur
OFF
Condensing pressure
60ºC
equivalent saturated
temperature
OFF
Function
OFF

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrv ii rxyq8matlVrv ii rxyq8maylVrv ii rxyq5maylVrv ii rxyq5mayleVrv ii rxyq8mayleVrv ii rxyq5matle ... Show all

Table of Contents