Important:
You can hot swap power supplies while the switch is operational. One power supply is required
for continued switch operation. PoE+ load reductions can occur if you remove one power supply
while the switch is operating with dual power supplies.
Connect AC power
This section explains power cord specifications and how to connect AC power.
Power cord specifications
To connect AC power to the switch, you need an appropriate AC power cord as described in the
following table, also see the following table for plug specifications.
Table 13: International power cord specifications
Country and Plug Specification
Continental Europe:
• CEE7 standard VII male plug
• Harmonized cord (HAR marking on the outside of the cord
jacket to comply with the CENELEC Harmonized
Document HD-21)
United States of America, Canada, and Japan:
• NEMA5-15P male plug
• UL-recognized (UL stamped on cord jacket)
• CSA-certified (CSA label secured to the cord)
United Kingdom:
• BS1363 male plug with fuse
• Harmonized cord
Australia:
• AS3112-1981 male plug
Danger:
Using power cords with a proper grounding path
November 2016
Installing Avaya Virtual Services Platform 4450GSX-PWR+ Switch
Comments on this document? infodev@avaya.com
Specifications
• 220 or 230VAC
• 50 Hz
• Single phase
• 100 or 120VAC
• 50–60 Hz
• Single phase
• 240VAC
• 50 Hz
• Single phase
• 240VAC
• 50 Hz
• Single phase
Connect AC power
Typical Plug
31