Install Equipment On Outdoor Structure; Figure 3-17: Active Status (Omc) - Baicells Nova-227 Installation Manual

Od 2x250mw tdd enodeb
Hide thumbs Also See for Nova-227:
Table of Contents

Advertisement

3.6.2 OMC
To check the eNB's status using OMC, follow the steps below.
1. Open a Web browser, and enter the CloudCore address:
https://cloudcore.cloudapp.net/cloudcore/
2. Go to eNB > Monitor, and check the Active Status field as shown in Figure 3-17. If the
status is not reported as active, contact Baicells support.

Figure 3-17: Active Status (OMC)

3.7 Install Equipment on Outdoor Structure

Installing the eNB should be performed only by qualified installation technicians per the
operator's network design plan and according to industry standard safety precautions.
Hoisting the RF antenna and eNB onto a tower or other structure may require more than one
person. Follow standard safety precautions for working at the expected height and as required
for electrical installations. Always wear proper tower climbing safety gear and follow tower
climbing safety certification rules. This section provides recommendations for the installation.
NOTE: It does not matter if the eNB or the antenna is installed first, or together at
the same time.
3.7.1 Cable Length
In general, it is best to keep the RF cable length between the eNB and antenna as short as
possible to minimize signal attenuation. Typically, the eNB will be located within a few feet
from the antenna.
3.7.2 GPS Positioning Considerations
Consider the following concerning GPS positioning when installing the eNB.
The GPS antenna should be free of any major blocking from buildings in the vicinity. Make
sure the space atop within 45 to 90 degrees is not blocked by any buildings.
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nova227

Table of Contents