Figure 3-3: Pole Attachment; Figure 3-4: Mark Drilling Points; Figure 3-5: Fix Enb To Bracket, Adjust Angle - Baicells Nova-227 Installation Manual

Od 2x250mw tdd enodeb
Hide thumbs Also See for Nova-227:
Table of Contents

Advertisement

2. Attach the eNB to the pole, passing the omega through the threaded rods and then
loosely fastening the two nuts (Figure 3-3).

Figure 3-3: Pole Attachment

3. Adjust the eNB to the proper angle based on RF coverage goals, and tighten the screws.
3.2.2 Install on Wall
Before installing the Nova-227 on an outside wall, complete the steps in sections 3.3, 3.4, 3.5,
and 3.6.
Ensure that the wall can bear at least 4 times the weight of the eNB. Follow the steps below
to install the eNB on the wall.
1. Fit the eNB on the wall, and mark the drilling points (Figure 3-4).

Figure 3-4: Mark Drilling Points

2. Drill four .5 in/12mm diameter and 3.2 in/80mm deep holes in the wall at the marked
locations.
3. Check the up/down direction of the installation bracket and then fix the eNB to the
wall using M8*80 expansion screws. (The U-shape clamp is not used for wall
installations.)
4. Fix the eNB on the bracket using the screws, and adjust it to the proper angle based
on RF coverage goals for the site (Figure 3-5).

Figure 3-5: Fix eNB to Bracket, Adjust Angle

14