Power On The Enb To Check Leds; Enter Basic Configuration; Figure 3-8: Check Leds; Figure 3-9: Gui Login - Baicells Nova-227 Installation Manual

Od 2x250mw tdd enodeb
Hide thumbs Also See for Nova-227:
Table of Contents

Advertisement

3.4 Power on the eNB to Check LEDs

Power on the eNB, and check that the LED indicators are lighting as expected (Figure 3-8):
powered on, running, and active with no alarms. Refer to the LED descriptions in Table 2-2 in
section 2.3.

Figure 3-8: Check LEDs

After checking to see that all connections are secure and the eNB hardware is operating as
intended, continue to section 3.6. If the eNB is not operating properly and you have double-
checked that all steps up to this point were completed correctly, please contact
support
before continuing.

3.5 Enter Basic Configuration

Reference:
Baicells Configuration & Network Administration
The initial basic configuration of the eNB covers the minimal parameters required for the eNB
to connect to the backhaul and to the Baicells CloudCore. This section does not cover all
configuration options available through the eNB GUI. Please refer to the document referenced
above for information on all GUI menus and fields.
With the Ethernet cable connected to the eNB ETH port and the other end to a local PC,
perform the following steps.
1. Open a Web browser, and enter http://192.168.150.1. The eNB GUI login screen will
open (Figure 3-9). Use the default user name and password of admin/admin. Later,
you will be able to enter a more secure password.

Figure 3-9: GUI Login

Guide, section 2
16
Baicells

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nova227

Table of Contents