Postal Lock - Chamberlain MyQ Business CAPXL Installation Manual

Connected access portal - high capacity
Hide thumbs Also See for MyQ Business CAPXL:
Table of Contents

Advertisement

Available languages

Available languages

INTRODUCTION
PRE-INSTALL
INSTALL
NETWORK
ACCESS CONTROL

Postal Lock

1. Remove the wing nut and plug. Discard the wing nut and plug.
2. Remove 4 mounting nuts from studs.
3. Install postal lock using 4 nuts from step 2.
4. Cut the factory installed wire tie from the postal lock switch.
The postal lock switch is wired from the factory.
Wing Nut and Plug
Postal Lock
22

Advertisement

Table of Contents
loading

Table of Contents