3.2
Steps in selecting and commissioning the digital module
3.2
Introduction
The table below contains the steps required to successfully complete commission of digital
modules.
Although this sequence is suggested, you may nonetheless carry out specific steps, or install
or commission other modules, at your own time (for example, assigning parameters to the
module).
Step sequence
Table 3-7
Steps in selecting and commissioning the digital module
Step
Procedure
1.
Selecting the module
2.
Installing the module in the SIMATIC S7
system
3.
Assigning module parameters
4.
Commission the configuration
5.
If commissioning was not successful,
analysis of the configuration
See also
Module overview (Page 3-2)
Programming digital modules (Page 3-8)
Diagnostics of digital modules (Page 3-9)
Parameters of digital output modules (Page A-4)
S7-300 Automation System Module data
Manual, 08/2006, A5E00105505-04
3.2 Steps in selecting and commissioning the digital module
See...
Modules overview
and the specific module chapter
Installation
chapter in the relevant PLC Installation Manual:
S7-300 Automation System, Hardware and Installation, or
•
S7-400 / M7-400 Automation System, Hardware and
Installation
or
Distributed I/O Device ET 200M
•
Diagnostics of the digital modules
Commissioning
chapter in the relevant PLC installation manual:
S7-300 Automation System, Hardware and Installation, or
•
S7-400 / M7-400 Automation System, Hardware and
Installation
or
Distributed I/O Device ET 200M
•
Diagnostics of digital modules
Chapter
Digital modules
3-7