5 Installation and Commissioning
5.4 Commissioning
No.
Under "Properties of the CP 1242-7 GPRS V2 > Partner stations > Connection to
5.
partner", adjust the partner IP address (fixed IP address of your DSL router)
required for the connection to the TeleControl server in the central station.
Select the station "CP1242-7_Teleservice".
6.
7.
Download the project into the remote station.
Note:
The PN/IE interface is used for loading the project data. The loading occurs via the
PROFINET interface of the station. After loading the project data, the PROFINET
interface is no longer used. Remote maintenance occurs via the internet.
8.
After having loaded the configuration, a connection to the TCSB V3 is established.
TeleService with TCSB
Entry-ID: 56720905,
V1.0,
10/2016
Action
„WAN-IP-ADDRESS"
30