Commissioning, inspection, maintenance
Filling the heating system
Total permissible hardness of the fill and top-up water
Total heating output
kW
50
≤
50 to
200
>
≤
200 to
600
>
≤
600
>
Fig. 21
Connection set with integral low loss header
Fig. 22
Connection set without low loss header
32
(cont.)
Specific system volume
< 20 l/kW
3
3.0 mol/m
(16.8 °dH)
≤
2.0 mol/m
3
(11.2 °dH)
≤
1.5 mol/m
3
(8.4 °dH)
≤
3
< 0.02 mol/m
(0.11 °dH)
A
A
20 l/kW to < 50 l/kW
≥
3
2.0 mol/m
(11.2 °dH)
≤
1.5 mol/m
3
(8.4 °dH)
≤
0.02 mol/m
3
(0.11 °dH)
≤
3
< 0.02 mol/m
(0.11 °dH)
1. Check the pre-charge pressure of the diaphragm
expansion vessel.
2. Close the gas shut-off valve.
3. Filling the heating system:
■
Single boiler system: valve
■
Multi boiler system: valve
System pressure
1.0 bar (0.1 MPa).
>
4. Close boiler drain & fill valve
50 l/kW
≥
3
< 0.02 mol/m
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
< 0.02 mol/m
3
(0.11 °dH)
3
< 0.02 mol/m
(0.11 °dH)
A
(see page 35)
F
.
A