For your convenience, plug the lower cables first.
1. Locate the cable using the port number written on the rabel.
2. Orient the plug and push it strongly into the corresponding port in the
LIe, until it clicks.
If necessary, examine the port and the socket to orient the plug
correctly before insertion.
If the LIe is a type 3, check the plugging diagram to determine which
of the two sockets should be used.
Repeat this step for every Lie or Lie cable to be installed.
Step
9
Updating the CDF
Go to "Upgrading or Updating CDF" on page 5-7 and perform the steps
as instructed, then continue with the next step.
Step 1 0
Testing the LlC 1, 3, or 4
If you only removed L1C or L1C cables, go to Step 12.
For new L1C or L1C cables installed, refer to the wrap test (WTT)
function in the Advanced Operations Guide, SA33-0097 and perform the
automatic wrap test at the Lie level. NCP must be loaded to run WTT.
Step 11
Activating lines
Ask the host operator to activate the line(s) of all newly installed LlC(s)
or LIe cable(s).
Attention - - - - - - - - - - - - - - - - - - - - - ,
If one of the affected lines was not deactivated at Step 3 on
page 2-14, you may be forced to re-Ioad the NCP.
Step 12
You have finished this procedure
If you have no other connection tasks to do, replace the cable-retaining
bar and ground plate assembly (if you removed it at Step 8 on
page 2-16), close, and lock the door using the special key.
Note:
The ground plate serves to reduce the possibility of radio
frequency interference that might be caused by the operating machine.
A proper installation of the ground plate is necessary to meet FCe
requirements, and to conduct electrostatic discharges to ground.
Chapter 2. 3745 Models 130 to 17 A: Connecting LlCs and Cables