Verifying Package Contents

• Before installing the switch, first verify that the switch is operational by powering it on and observing
• For 10/100 ports and 10/100/1000 ports, the cable length from a switch to an attached device cannot
• Operating environment is within the ranges listed in
• Clearance to front and rear panels meets these conditions:
• Airflow around the switch must be unrestricted. To prevent the switch from overheating, you must have
• Ambient temperature does not exceed 140°F (60°C).
• Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent lighting
Verifying Package Contents
Included in the box is the switch itself and it's installation documentation. If any item is missing or damaged,
contact your representative or reseller for support.

Tools and Equipment

Obtain these necessary tools and equipment:
• A single or a pair of stud size 6 ring terminals (Hollingsworth part number R3456B or equivalent) for
• Crimping tool (Thomas & Bett part number WT2000, ERG-2001 or equivalent).
• 10-gauge copper ground wire.
• UL- and CSA-rated, style 1007 or 1569 twisted-pair copper appliance wiring material (AWM) wire for
• Wire-stripping tools for stripping 10-, 16-, and 18-gauge wires.
• Number-2 Phillips screwdriver.
• Flat-blade screwdriver.
• 15mm 12pt socket for IP67 dust caps
Cisco Catalyst IE3400 Heavy Duty Series Hardware Installation Guide
12
boot fast. Follow the procedures in the
exceed 328 feet (100 meters).
• Front-panel LEDs can be easily read.
• Access to ports is sufficient for unrestricted cabling.
• Front-panel direct current (DC) power connectors and the alarm connector are within reach of the
connection to the DC power source.
the following minimum clearances:
• Top and bottom: 2.0 in. (50.8 mm)
• Sides: 2.0 in. (50.8 mm)
• Front: 2.0 in. (50.8 mm)
fixtures.
use as a protective ground connector.
DC power connections.
"Where to Go Next" section on page 14
Appendix F, "Technical Specifications."