Verifying Package Contents - Cisco Catalyst 2970 Hardware Installation Manual

Hide thumbs Also See for Catalyst 2970:
Table of Contents

Advertisement

Chapter 2
Switch Installation

Verifying Package Contents

Note
OL-6422-01
Airflow around the switch and through the vents is unrestricted.
Temperature around the unit does not exceed 113°F (45°C).
If the switch is installed in a closed or multirack assembly, the
Note
temperature around it might be greater than normal room temperature.
Carefully remove the contents from the shipping container, and check each item
for damage. If any item is missing or damaged, contact your Cisco representative
or reseller for support. Return all packing material to the shipping container, and
save it.
The switch is shipped with these items:
Catalyst 2970 Switch Getting Started Guide
Regulatory Compliance and Safety Information for the Catalyst 2970 Switch
AC power cord (AC-powered switches)
One RJ-45-to-DB-9 adapter cable
Mounting kit containing:
Four rubber feet for mounting the switch on a table
Two 19-inch rack-mounting brackets (also used for wall mounting)
Six Phillips flat-head screws for attaching the brackets to the switch
Four Phillips machine screws for attaching the brackets to a rack
One cable guide and one black Phillips machine screw for attaching the
cable guide to one of the mounting brackets
One Redundant Power System (RPS) connector cover (for wall
mounting)
Two Phillips pan-head screws (for attaching the RPS cover)
Four Phillips truss-head screws (for wall-mounting brackets)
Catalyst 2970 Switch Hardware Installation Guide