Commissioning

The gas pressures must be checked against those printed on the data plate of the
appliance. The pressures are factory set and may not require adjustment. When
checking the operating pressures the combustion chamber glass must be on.
Commissioning sheet (and small 19 mm
spanner) located on top of the PCB cover
Pilot pressure test point
Main burner pressure test point screw
26 | Ember Installation Guide: 12890-B 02-18
The commissioning sheet, and a 19 mm small
spanner for the gas connection, is located in a
plastic pouch inside the unit on top of the PCB
cover.
Follow the commissioning instructions to complete
the gas pressure checks. When commissioning is
complete check for full and correct operation of the
appliance, and return the commissioning sheet to
its plastic pouch.
Inlet pressure test point screw
Pilot pressure adjustment screw

Installing the frame

Easy four stage process, which will be the same regardless of frame type, for
example 3-sided frame, 4-sided frame, or the 700 masonry frame.
CAT5 connection
Lower screw position
1. Position the frame assembly in front of the engine and connect the CAT5 cable to the frame.
This connects the push button control panel to the engine's box.
2. Slide the two top frame hangers into the corresponding frame slots on the Ember engine
and push the lower section into the recess of the engine.
3. Secure the top section in place, using the screws provided, via the three U-shaped fixing
positions on the frame.
4. Secure the lower section of the frame in place using the two bottom side screws.
U-shaped fixings (1 of 3) for
screwing the frame in place
Frame hanger (1 of 2)
Frame slots
Ember Installation Guide: 12890-B 02-18 | 27